Wednesday, December 24, 2008

Rush before the xmas break...

Spoke to C (sutomer service) today as we had received another set of plans which had gone to council with the whole house flipped and back to the basic 1st set of drawing which were done around April. So i rang to let her know that we had made many many changes since this first set of drawings. I also questioned which side the cross over was on as the drawings were showing them at the left side, even though the contract, lot drawinngs and the actual block showed it on the right. she said the council plans were right and she'd send out the new drawings.



We went for a drive out to the block to check that we actually had the right block as i thought maybe we had been looking at the block next door. But i counted the lot numbers back from the house 3 doors up that has a sign with the lot numbers, and we have the right block. So now i have to wait til they are back in the office 5th Jan to call them and tell them. Not even sure who will be back, but this is just dragging on too long and i want them to start builging already..

So much for having a slab before Christmas. ha